    2014-11-13 10.18.59I just returned to frigid Boulder, CO from the USENIX LISA 2014 conference in sunny (not warm, but completely tolerable) Seattle, WA. For those unaware, LISA is the Large Infrastructure System Administration conference, which held its inaugural conference in 1986. A lot has changed in the past 28 years, but LISA continues to demonstrate (and serve) the need for members of large organizations to meet to share and learn the latest techniques, methods, and technologies. One might even venture to say that LISA is a conference that could be unaffected by new technologies and methodologies: until systems and networks can completely manage themselves, it seems highly likely that we won’t arrive at the grand unification methodology for systems administration, nor will we run out of new technologies.

    Interest in DevOps on the show floor was somewhat limited based on my many conversations. Some were true converts preaching to create DevOps converts and bolster the faithful, others were debating what DevOps means, and still others were unsure what it was. One even questioned the name, “DevOps,” and instead argued for the term “Operations Automation,” to avoid the unpleasantness involved in trying to figure out who “owns” DevOps: is it developers or systems admins? In my opinion (and I think the prevailing opinion) is that the whole business must own it, similar to the Lean Manufacturing trends of the ’90s. However, out of the many folks I spoke to, DevOps was a primary interest to only about 2-3% of the population.

    That’s pretty representative based on my understanding of the general technical population, but that’s perhaps twice what I’ve heard quoted recently, around 1-1.5% overall technical penetration. I take that as a good sign: it says to me that DevOps is being adopted in larger organizations by folks who wield significant power within their organizations.

    Out of the distinguished speakers at LISA this year, about 40% of them had some relation to DevOps, even if DevOps wasn’t specifically mentioned: the goal of automating previously manual processes to improve efficiency and time to market was a common theme. Believe me, that 40% number was not generous, others might argue that several other talks were also DevOps-related. LISA continues to show its relevance, bringing the latest methods and technologies into enterprise stalwarts. The future looks bright for large enterprises, with (in some cases) grizzled old system administrators, handily learning new tricks (even if they don’t want to admit it), thanks in part to the LISA conference.

  • Waterfall and Agile, the effect of automation and continuous integration

    Waterfall and Agile, the effect of automation and continuous integration

    Agile’s A Silly Idea?

    I was a young developer working at a large enterprise when I first heard about some of the principles that later became part of the Agile process back in the mid- to late-90s.  I was skeptical about what I heard, to say the least. After all, what we today call waterfall had been the norm for a long time; software got built and then made stable in the end. Yes, it required a lot of wailing and gnashing of teeth, but wasn’t that the way it was supposed to be?

    The idea of pair programming at first seemed like a joke to me when I first heard it: talk about a waste of time and resources, and the perfect way to allow a mediocre developer to skate by and let someone else do all the hard work. Just the perfect thing for big companies: let the dead weight glom on to the ones who were productive.

    Even the names, titles like Scrum and Extreme Programming sounded like a joke. Ooh, you’re an Extreme Programmer… let me kiss your feet! Ah, the good ole’ days as a young developer, with a huge ego, showing everyone else how to do it. But I digress. Anyway, I was of course skeptical, having the first discussions around Agile handed down to me from on high, from some nameless technology group that couldn’t possibly understand our world, or understand that we were building high quality software saving our company millions of dollars a month in automation.

    I was never put into the XP training programs that were being instituted: I ended up leaving that company before I was exposed to it. So, I went from that job to a start up product company, StillSecure, where we also fully embraced waterfall, but a less documentation-heavy version of it, and we didn’t have business analysts. And, rather than 18 month schedules, we were working on 3-4 month schedules. It was waterfall-lite, and it did work a lot better (even if to meet our deadlines, we had to cut scope or take a hit on quality). We came a lot closer to our goal on the 3-4 month schedules than we ever did on an 18 month one.

    Sometimes Agile Just Doesn’t Work

    At one point, though, we did attempt some 12-18 month projects, and failed miserably: the complexity got the best of us, and it was too easy to allow scope creep to kill us. In the end, because of the complexity of test automation on our product, we got to where we had to settle into a 6-7 month release schedule: we had to build enough into a release to make it worthwhile for all the testing that had to go into it. We did automate some testing, but all the really time-consuming work involved network equipment, such as switches, VPN concentrators, and routers in the lab, and testing different scenarios with different network configurations. Something that even now cannot be fully automated, or at least not at a reasonable cost.

    Agile without Automation is Decidedly Not Agile

    Along the way, we started building a new product, a SaaS-based firewall management system focused on the cloud. Since we were starting with a clean slate and a very small team, we decided to try to be more Agile-like. We moved to a two-week iteration model, but released about every six weeks to our customers. In hindsight, two things prevented us from realizing the best benefits of Agile:

    1. We were completely focused on building new features, and invested no time in test automation.
    2. We had a really strong QA lead that was very effective, and quick enough to keep the developers on their toes fixing bugs for a week or two following each iteration.

    Okay, so #2 was more an excuse, not really something that prevented us. However, when you’ve got someone like that, it makes it difficult to say: we’re going to slow down and build test automation so that we can build features faster. However, that’s a short-sighted view: sure, you can get away with it early on, but complexity builds and builds to the point where a single person can’t keep up with the testing demands, and then you’ve got to make the hard choice: hire another QA person, or go back and automate as much testing as possible. You take the hit one way or another: but building test automation as you go lets you establish a credible cadence and ensures that you can survive things like a code refactor without investing a lot of time to prove out that you didn’t break anything. That means a lot as your code base gets large: it’s the difference between having to build your product on an increasingly shaky foundation, or allowing you to quickly and cheaply improve your foundation as you go.

    I mentioned in my last post my frustration with being expected to predict the future months or even years in advance, and being held accountable for my predictions despite any number of factors changing compared to the original plan. Using shorter iterations did indeed allow us to better predict what we would get done in any given time period, but my management still expected that I would meet a long term roadmap, on a set schedule. That part didn’t fit well with Agile, it was still waterfall-thinking with an Agile wrapper. And, we failed miserably when tracking against those longer-term expectations. In the end, that was the primary reason that I could get behind Agile methodologies: the understanding that methodologies which require and expect a software project to unfold perfectly, without changes over the course of months or even years, is a methodology built to fail.

    To compensate for this fact, competent waterfall project managers create a strict change management process to track all the reasons why a software project plan doesn’t come to fruition as everyone expected up front. This prevents surprises for management, and makes sure that everyone knows which decisions were made, and why. Without that list of excuses, any long term project would be considered an abject failure: even small projects experience relatively large numbers of change requests during the course of a long development cycle, and more often than not, in my experience, those changes increase the effort required to complete the project, because they often account for complexity that was not known at the time the system was designed.

    Agile admits that things change over time, sometimes drastically, and builds that into the process. It’s easier on the team, the managers, and the leadership of the company: no one gets a false date to commit to a customer, and yet the team can continually make measurable, reliable progress toward a long term goal. And, because you change less between each test cycle (with continuous integration, you run tests each night, or prior to each build), you don’t end up with a hot mess of code wherein you have to spend weeks or months just to get to stability before you can fix all the other new bugs you just introduced.

    But is Agile actually more productive?

    The following chart shows an estimate of the ongoing code stability during a typical 6 month waterfall project with no continuous integration versus an Agile project. The dip from weeks 2-7 are the coding phase of a waterfall project, where the code is “on the operating table” and completely unstable, having no integration testing done on it. On the Agile side, the code may fall somewhat in terms of overall stability, but continuous integration testing helps prevent massive drops in stability that then requires massive effort to recover from.

    Agile Waterfall Stability graph This graph is entirely anecdotal, based on my experiences with Agile and Waterfall. What I’ve seen is that over the course of a Waterfall project with no continuous integration, the stability of the code essentially hits zero (the system does not work at all, and may not even compile cleanly) very quickly without continuous integration, and only slowly returns to a high level of stability as system integration testing proceeds. In a project that leverages continuous integration, it’s impossible for this deep dip in stability to occur, because a continuous integration environment would break with this kind of instability. However, some dips do occur, as a result of missing test cases that cannot be caught by the continuous integration environment. Even with the best efforts of developers, it’s impossible to catch every potential case, so stability drops slightly from the maximum in this environment, and fluctuates. This graph changes completely for a waterfall project that leverages continuous integration: it ends up looking more like Agile as far as code stability goes. Does that then provide some evidence, at least, that Agile methodologies are valuable only in so far as how much automation of the testing process they do? That leaves us with two controversial open questions:

    1. Which methodology ends up as the more productive one, generating more features for customers per unit time?
    2. And, which methodology provides better time to market?

    Those aren’t the same question: time to market provides you with something to put in front of customers as early as possible. Generating more features in a given time lets you build more functionality in less time overall: helping you keep up with or pass competitors. Some might argue that waterfall is best on #1, and Agile best on #2. I’ve seen some waterfall teams build deep functionality very quickly, at very high quality.

    It’s the Automation, Not the Process

    Whichever meets your goals better, one thing is certain: automating things that can be automated is always a good idea. In fact, that mantra has built the entire industrial age. In my opinion, waterfall methodologies can take advantage of continuous integration and test driven development, and yet still retain its very thoughtful, well-documented, very architecture-focused view of the world. The transition to DevOps, whether from an Agile or a waterfall methodology, is pretty easy from there: invest in automation up front, and you’ll go faster over the long term. Next time, I’ll talk about my experiences with DevOps at JumpCloud, and what it enables us to do that we couldn’t do otherwise, and the implications that has for reliability and security.

  • My Journey to the Land of DevOps

    My Journey to the Land of DevOps

    Welcome to my first installment in a series where I talk about my long transition as an engineer, first from a very traditional waterfall development methodology into a more Agile process, and finally into a true DevOps organization at my current gig at JumpCloud.

    Who Am I?

    First, a little background on me. I’m (almost) a lifelong coder, and by that I mean I started writing my first simple programs at 9 years old, on a HP 3000 MP/E host running MP/E BASIC. I got my first computer at home at 12, a Radio Shack TRS-80 with a whopping 16K of RAM, and a cassette drive for loading and saving programs. I’ve had computers in my house since then, and probably never in my life since have I gone more than a week without being in front of a computer.

    I love building software, but for a long time, I was resistant to changing how I did that in a professional environment. But, I try to be a guy who’s open to at least evaluating new stuff, even if I don’t dive into new things as a way of life. I tend to be one of those guys who does it (everything) the same way over and over until I see a way that is demonstrably better. I’m a creature of habit, but I’m also a creature of continuous improvement (as long as I can see the improvement).

    In college, I did a fair amount of system administration work on UNIX systems, including BSD and some System V R4 boxes. During that stint, I learned quite a bit about how not to destroy systems by running rm -rf /etc (every system admin does that on a production box at least once, don’t they? If you haven’t, I can’t really recommend the rush that comes from recognizing that you’ve just decided how you’re going to spend your night, instead of sleeping), and how to install, backup, maintain, and fix big (but by today’s standards laughably slow) mini-computers. I’ve always maintained UNIX/Linux system administration as a skill set, and it’s always come in handy.

    After that, I jumped into software development, in databases, security, and systems programming.

    You get the idea: I’ve been around awhile, and I’ve done enough to be able to gauge whether a new technology or process is valuable or not. And, because I’ve done dev, operations, and DBA work, I think I can offer a solid perspective on the transition to DevOps.

    The Waterfall Method, or, How Can We Fail Big?

    Looking back, Waterfall as we practiced it then was comparable to building a campfire, versus the subtlety and refinement of fireworks, and Agile methodologies.

    Waterfall is the place where we all started (for those of us joining the workforce in the early 90s). That was how software got built: no ifs, ands, or buts. We all “enjoyed” the many hours of building requirements with business analysts, the joint application design (JAD) sessions with clients, the weeks of first writing functional specifications, then moving to the design phase and building design specifications. In the midst of all that, iterating through many reviews with stakeholders under the watchful eye of our project manager.

    Once we got to coding (on my teams, at least) the docs were treated as an afterthought for the most part. Sure we’d open them up periodically to see if we’d missed a requirement, or if there was an argument about some previous decision we’d made. But, most of the time, most of us didn’t code with a document open in one window, and code in another. Sometimes we did, but inevitably we’d hit a section that literally or figuratively says, “magic happens here” (nerdspeak for, I have no idea how that’s going to work) and then go off the rails: the specs never to be seen again.

    When the coding was done, we’d package everything up, and throw it over the wall to QA. QA would start cranking through executing their test plans, doing ad hoc testing, rarely doing load testing, and eventually (through internal iteration – sounding a little like Agile?) would make our software look like the requirements spec, or at least what it was made to look like after the dev team spent a lot of hours and countless emails asking the client detailed questions about how a particular thing should work. QA would then pronounce that version good, and either we (the dev team) or an ops team would actually deploy our software to production.

    Oh, and by the way, I missed another step: the deployment documentation. This file goes here, reboot the system at this point, install this package, upgrade to this version of the database or OS. All that fun stuff got written into documents, and executed by humans, over and over again. And did I mention, that had to be tested, too? And maintained? And that inevitably would result in a developer getting a call in the middle of the night, or during a weekend change window to get things back on their feet?

    Oh, the joys of writing documentation that was out of date almost as soon as it was finished, the deviations from it that occurred when you were building real software to handle real world cases that you never considered during the specification phase. It was almost as if all the docs were completely useless. But, well-paid individuals spent countless hours to build them. They did look impressive, and it showed that we were doing things “professionally”, not just getting out and starting to code something, because that would be crazy.

    I should probably mention at this point that I’ve never been involved in building software for applications that could have life-threatening consequences, or that are one-chance things, where you spend years building the software, and if you don’t get it right, human lives, or millions or billions of dollars can be lost. I think the extreme levels of documentation, planning, and review cycles are still necessary for these types of applications, though I think both Agile and DevOps have benefits to offer parts of these projects, more on that later. In my view, these applications are not ones that lend themselves to lots of iteration, at least not externally: “Oh, I’m sorry, captain, the feature that lets you apply landing brakes is not part of this release. The team says that’s coming in the next sprint.”

    Microsoft Project: The Wrong Tool for the Job

    All this work took a long time, and managers were still under the illusion that project managers could predict the future. Management would say: you have 18 months to get this project done, and we’d open Microsoft Project (as though we were about to build a building or something), and start putting in development tasks. We’d estimate based on our prior experience how long a particular task was likely to take, and schedule it all out. We’d nearly always end up reducing scope at that point to make all our work fit into that short(!) 18-month schedule. I remember spending hours in Project trying to make all the dependencies work, and then seeing the schedule get changed over and over as we changed from one task to another based on what was logical at the time, not what was on the schedule.

    We’d go back to management, and say, this is what we think we can do in 18-months. The more astute project managers would give a best case, likely case, and worst case estimate, all of which would be wildly different. We’d play games like ensuring that the weakest members of the team never became part of the “critical path” (the path of tasks that was packed full from beginning to end, such that missing a deadline would delay the whole project). To try to reduce risk, we’d build risk mitigation documents that listed out all the stuff that could go wrong, and what we were going to do to fix it and get the project back on track.

    Management would take our project schedule, risk mitigation plans, and high level functional spec, look it over, ask some pointed and thoughtful questions, and send us away again to improve our plan. Nearly everyone in the process was competent, professional, and thoughtful. And, in the end, everyone in the process was horribly, brutally, wrong: repeatedly.

    Even if we met major milestones on schedule, it was very rare to actually hit a scheduled end date. Something new would pop up, something would go wrong, something would be harder than we thought, and these somethings would pop up more frequently the longer, larger, and more money we threw at a project. So, as the risk level increased, so did the likelihood of failure. It was almost a foregone conclusion that we’d have to cut scope before the end of the project to try to meet our original deadlines. Or, the team would end up in a death march for months on end to try to pull the schedule back. Or, we’d cut into the time set aside for QA. Or all of the above.

    We learned all too well the old project management axiom that you can have any two of: time, quality, or cost. That is, you can get something fast and of high quality if you want to spend a lot of money to get it. Or, you can go cheap and fast, at the cost of quality. Or, finally, you can get great quality and low cost, if you want to take more time. That was called out especially harshly when iterations were counted in years, rather than months or weeks.

    The funny thing was that we all fought with these problems daily, and we argued with management about how broken the process was, that all the specification and up front planning work (especially when building phone books or mailing lists) wasn’t useful, but in the end, we all just kind of continued down the same path, until the late 90s, when the ideas of Agile development first started taking root.

    Next time, I’ll focus on Agile, my initial reactions to it, and and how it started gaining traction.